Opening status

What has to happen before we open

Every item the team still owes before Nexier School opens, taken straight from the team's register. Nothing is skipped to open sooner.

This page is built from the team's debt register, so it changes when the register changes.

Blocks the real opening

IDItemState
D-014a namesClosed
D-02Verified guardian consent methodHosting setting
D-03Lawyer's opinionLegal review
D-04Guardian-first activationHosting setting
D-05Real-model safety suite and semantic layer not run on this routeEngineering
D-06Human route opens no safeguarding caseClosed
D-07Retention periods and SEL never soldOwner decisionLegal review
D-08Human teacher signs grades and termsEngineering

Weakens the live class

IDItemState
D-09Microphone in the Live classEngineering
D-10No streamingClosed
D-11Shared gateway ceilingClosed
D-12No School budget figureOwner decision
D-13No curriculum bindingEngineeringAfter D-03
D-14Copied codeEngineering
D-15No end-to-end test of the Live class pageEngineering

Settings the owner holds

IDItemState
D-16Preview env vars on the Vercel project nexier-schoolHosting setting
D-17nexier-school repositoryOwner decisionEngineering

Web surface

IDItemState
D-18Dashboards show sample dataEngineering
D-19Turkish dashboards and Live class chromeClosed
D-20Opening status page is hand-keptClosed
D-21Brand fonts not servedClosed
D-22Home Live class panel is a scripted exampleOwner decisionEngineering
D-23Grade-level table is orientation onlyOwner decisionLegal review
D-26Turkish copy has no native-speaker reviewClosed
D-34AI School Senate first meetingEngineering

Target countries

IDItemState
D-24One legal pack per countryOwner decisionLegal review
D-25Consent method must fit every target countryOwner decisionLegal review

Guardian card check: owner and ops steps

IDItemState
D-27Stripe restricted key for SchoolOwner decision
D-28School webhook endpointOwner decision
D-29Vercel env vars on project nexier-schoolOwner decision
D-30Supabase Auth settings for the School projectOwner decision
D-31Apply the School migrations (school3, then school4, then school5)Closed
D-32What the card check does not cover yetEngineeringOwner decision
D-33Public enrolment switchHosting setting